The short answer
A useful engineer's report states the level of investigation, what was observed, what was measured, what the engineer concludes about cause and performance, what is recommended and why, and is sealed and signed by a Texas-licensed professional engineer. A post-repair letter should state what was done, any deviations from the design, and the post-repair elevations.
For an evaluation
Scope and level. The ASCE Texas Section guidelines define Level A, B and C investigations, and say a Level A report must not imply a higher level. The report should say which it is.
History and documents reviewed. Interviews, prior reports, past work records, permits.
Observations. Distress by location, drainage, vegetation, plumbing, slab edge conditions.
Measurements. For Level B and above, an elevation survey with a drawing, the reference point, and deflection and tilt calculations compared with tolerances.
Conclusions. Whether the foundation is performing, what likely caused any adverse performance, and the engineer's reasoning connecting numbers to symptoms.
Recommendations. Non-structural measures, monitoring, structural work, or further testing, with priorities.
Seal and signature. A sealed report identifies the engineer of record.
For a repair design
City permits commonly require a repair design sealed by a Texas engineer showing pier or footing locations and complete details. McKinney adds that the engineer's letter should identify affected plumbing that requires testing. The design should state the pier type and installation criteria.
For a completion letter
The guidelines say that after repairs the engineer should take floor elevation measurements, keep records and provide copies to the client, and may issue a letter of substantial completion noting any deviations from the remediation documents. McKinney requires a final engineer's report to close a permit; Mesquite finals permits on the engineer's letter.
Red flags
No level stated, and no measurements, but firm conclusions about deflection.
Recommendations without reasons.
Letters on repair company letterhead without an independent engineer's seal. Many repair companies work with engineers; ask about the relationship.
"Work complete" with no post-work elevations.
A very old letter offered as current. It described the house then.
Reading a seller's letter
Treat a seller's letter as history. It tells you what an engineer saw and what was done at that time. A buyer who intends to rely on the house's condition today usually needs a current evaluation. See reading a foundation repair estimate on Home Inspection Dallas for the buyer-side view of contractor proposals.
Common misreadings
"Sealed means correct." Sealed means accountable; reasoning still matters.
"A short letter is fine for a big job." Scope should match the decision.
Questions to ask about any letter
Who hired the engineer, and for what purpose? A letter written for a contractor's proposal, a seller's disclosure and a buyer's evaluation can all be sound, but each answers a different question. What level of investigation does it represent, and does its conclusion go further than that level supports? Does it include measurements, and were they taken on finished floors or adjusted for coverings? Does it explain cause, or only describe condition? And does the remedy it recommends match the cause it identifies? A buyer who asks those five questions of every letter will read most of them correctly.
Where the facts come from
ASCE Texas Section Guidelines, Version 3; City of McKinney and Mesquite foundation repair requirements; Texas Board of Professional Engineers, EAOR 43.