What it is
Underpinning places supports under an existing foundation to carry its load down to soil that is less affected by seasonal moisture change. On slab foundations, a contractor excavates beside or beneath the grade beam, installs the pile or pier, and transfers the foundation's weight onto it, often lifting the slab in the process. The ASCE Texas Section guidelines list underpinning first among slab remedial measures.
The common types
Pressed concrete piles, often precast concrete segments, are pushed into the ground one segment at a time with a hydraulic jack that reacts against the weight of the house. The Foundation Performance Association has published guidelines for the design, manufacture and installation of precast concrete segmented piles for underpinning. Its repair committee advised that pressed piles be driven to refusal, meaning until they lift the foundation, rather than stopping at a pressure reading.
Steel push piers, also called resistance piers, are steel pipe sections pushed into the soil the same way. A comparison published by a pile manufacturer's engineer describes them as end-bearing piles that displace soil as they are pushed.
Drilled or auger-cast piers are holes augered into the ground and filled with reinforced concrete. The same comparison describes auger-cast piles as developing capacity through friction along their sides, and as the most invasive option because of the excavated soil.
Each has advocates and limits. The choice depends on soil, access, load and the engineer's design.
What the guidelines say about results
The ASCE Texas Section guidelines are blunt: underpinning cannot be assumed to level the foundation, and elevation adjustments are unlikely to produce a level result. They also warn that grouting or mudjacking should not be done beneath underpinned foundations if expected soil swelling could damage the structure, and that "perfection is not attainable by remedial measures." Partial underpinning, which supports only one area, can leave the rest of the foundation free to move relative to it. After repairs, the guidelines recommend the engineer take new elevation measurements and keep records.
Why repairs fail
The Foundation Performance Association's study of post-repair performance catalogs the reasons repairs underperform, including piles that do not reach adequate bearing and continued soil movement around supported areas. That is one reason engineers emphasize drainage and moisture control alongside structural repair.
Who decides
A licensed professional engineer should design the repair, specify pier locations and type, and observe or verify the work. Texas does not license foundation repair contractors; bills to create licensing in 2011 and 2013 did not become law. Most DFW cities require a permit with engineer-sealed plans, as the repair permits sheet explains.
Common misreadings
"Lifetime piers mean a lifetime fix." A warranty covers what it says; soil keeps moving elsewhere.
"Underpinning will make the floor level." The guidelines say not to assume it.
"More piers is always better." Pier layout is an engineering decision.
Field notes
For a house with past underpinning, ask for the engineer's design, the pier plan, the pre- and post-repair elevations, the permit, and the warranty. See repair records and warranties.
Reading a pier plan
A pier plan shows the foundation outline with each pier's location marked, often numbered. Compare it with the elevation survey: piers should sit where the engineer found the movement, usually along the perimeter beam and at interior beams where needed. A plan that supports only one side of a house is partial underpinning, which the guidelines note leaves the rest free to move. Keep the plan with the warranty, because warranties usually cover the piers installed, by location.
Where the facts come from
ASCE Texas Section Guidelines, Version 3; Foundation Performance Association committee papers and its 2003 repair committee presentation; geoengineer.org summary of a residential repair options comparison; Texas Legislature bill analysis for HB 613 (2013).